Products & Services for better air duct systems

For trade customers only

Industry

Digiplex Data-Center
Read the case study

Digiplex Data-Center

Reduction of leakage: approx. 85 - 93%
Location: Fetsund, Norway

The Digiplex Data-Center in Fetsund near Oslo is an ultramodern server farm with a total surface of 4.200 m2. The two three-storey, air cooled buildings, have a capacity for 40.000 servers. For fire prevention reasons, the level of...

Read the case study


IST METZ Group
Read the case study

IST METZ Group

Reduction of leakage: 96,8%
Location: Nürtingen, Germany

IST METZ Group in Germany erected a new production site with a total surface of 4.900 m2. The duct systems in the ground floor and the second floor didn't meet the tightness class specifications. They were sealed...

Read the case study


Laboratory building EBEWE SANDOZ
Read the case study

Laboratory building EBEWE SANDOZ

Reduction of leakage: 97,5% resp. 95,2%
Location: Unterach, Austria

The main lines of the air duct system "Inspection" were sealed with Aeroseal in EBEWE Sandoz' production facility in Unterach/Austria. The target was to increase the...

Read the case study


Office building YOU
Read the case study

Office building YOU

Reduction of leakage: 88,2% in average
Location: Boulogne-Billancourt, France

The air duct systems of this new construction office building are mostly rectangular, highly branched, relatively flat and mounted behind a drop ceiling with a height of only 30 cm...

Read this case study


Office building Gentilly
Read this case study

Office building Gentilly

Reduction of leakage: 93,6% in average
Location: Gentilly, France

After several attempts to improve ductwork airtightness and after airtightness testing through a certified expert (QUALIBAT 8721),...

Read this case study


Office building Neuilly
Read the case study

Office building Neuilly

Reduction of leakage: 86,4% in average
Location: Neuilly, France

The office building was subject to extensive renovation work. After several attempts to improve ductwork airtightness and after airtightness testing through a certified expert (QUALIBAT 8721), an average leakage rate...

Read the case study


Office building Paris
Read the case study

Office building Paris

Reduction of leakage: 89% in average
Location: Paris, France

The office building was subject to extensive renovation work. After several attempts to improve ductwork airtightness and after airtightness testing through a certified expert (QUALIBAT 8721), an average...

Read the case study


Adminstration building Conseil Général
Read the case study

Adminstration building Conseil Général

Reduction of leakage: 92% in average
Location: Bordeaux, France

French MEZ-AEROSEAL partner MapClim was charged with the improvement of indoor air quality (IAQ) of the administration building of the Conseil Général de la Gironde in Bordeaux, France. In the context of an...

Read the case study


Office building Lyon
Read the case study

Office building Lyon

Reduction of leakage: 94% in average
Location: Lyon, France

Aeroseal professional MAPCLIM from France was assigned with this project, after airtightness tests in the building had shown that the required airtightness class B of the ductwork was not achieved. The office building...

Read the case study


ARGOS
Read the case study

ARGOS

Reduction of leakage: 97,50%
Location: Graz, Austria

Between 2015 and 2019, a commercial and residential building designed by star architect Zaha Hadid was built in the old town of Graz. On a plot size of 445 m², it accommodates restaurant and office...

Read the case study


Wedding Barn
Read the case study

Wedding Barn

Reduction of leakage: 80,10%
Location: Cotsworlds, area of national beauty

A new build wooden barn to be used as a wedding venue, the barn’s design included an underground plastic ductwork system. The ductwork system leakage rates exceeded the allowable...

Read the case study


Luxury Office
Read the case study

Luxury Office

Reduction of leakage: 95,10%
Location: New Bond Street, Mayfair, London

A luxury office fit out on New Bond Street in London, which included a medium class B ductwork system. All four ductwork system leakage rates exceeded the allowable rate of 3% outlined...

Read the case study


Office building
Read the case study

Office building

Reduction of leakage: 84 - 95%
Location: Bern, Switzerland

To reduce energy consumption in an office building in Bern, the air conveyor system had to be sealed reliably and without interfering with office operations...

Read the case study


Donau Center
Read the case study

Donau Center

Reduction of leakage: 99,6%
Location: Vienna, Austria

The Donau Zentrum Wien is a shopping center in the 22nd district of Vienna Donaustadt. Together with the Donau Plex, which is connected to the Donau Zentrum...

Read the case study


Main sewage treatment plant
Read the case study

Main sewage treatment plant

Reduction of leakage: 90,5%
Location: Vienna, Austria

At one of the topographically lowest points of Vienna, on the Simmeringer Haide near the mouth of the Danube Canal into the Danube, the main sewage treatment plant of the City of Vienna...

Read the case study


Office building Wexford
Read the case study

Office building Wexford

Reduction of leakage: 86,3%
Location: Wexford, Ireland

A newly built office building in Wexford could not be put into operation because the leakage rate was 50% and thus a stable operating condition could not be achieved...

Read the case study


Catalina office center
Read the case study

Catalina office center

Reduction of leakage: 93,1%
Location: Warsaw, Poland

Warsaw office building located in Mokotów district. Construction of Catalina Office Center started in 2007 and was completed in the fourth quarter of 2009..

Read the case study


Graffit office building
Read the case study

Graffit office building

Reduction of leakage: Supply 73% / Exhaust 78%
Location: Warsaw, Poland

Graffit Office is a relatively new (completed in 2019) office building on the map of Warsaw located in the business part of Mokotów district.

Read the case study


Motel One Warsaw
Read the case study

Motel One Warsaw

Reduction of leakage: (W1) 93,5% / (W2) 90,3% / (N4) 92,7%
Location: Warsaw, Poland

Motel One, this budgetary and designer hotel is located near the Vistula River in Warsaw‘s Downtown. Was opened in July 2019, and the opening ceremony was held on 24 October...

Read the case study


Spektrum-Tower / Twarda-Tower
Read the case study

Spektrum-Tower / Twarda-Tower

Reduction of leakage: (NA-2) 97,7% / (NB-2) 96,9%
Location: Warsaw, Poland

Spectrum Tower is almost 50,000 m2. It was commissioned to use at the end of 2003. It is located in the heart of Warsaw, right next to the Central Railway Station...

Read the case study


Dairy Gmunden
Read the case study

Dairy Gmunden

Reduction of leakage: 76,9%
Location: Gmunden, Austria

The Gmunden Dairy, which is still organized as a cooperative today, is one of the largest milk processing companies in Austria and can be traced back to the Traunsee Dairy Cooperative in Ebensee, which was founded by 40 farmers in 1931...

Read the case study


Mühltalhof
Read the case study

Mühltalhof

Reduction of leakage: 96,9%
Location: Neufelden, Austria

With 44 beds, cosmetics and relaxation area on the riverbank, sanarium, sauna, steam bath, shiatsu and hot stone treatments, curling and ice skating on the Great Mühl, the mix of tradition with creative design and much more, the Mühltalhof...

Read the case study


Spa Center Bad Hofgastein
Read the case study

Spa Center Bad Hofgastein

Reduction of leakage: 95,9%
Location: Salzburg, Austria

The Bad Hofgastein spa center in Salzburg was designed as a resort in the mountains and offers 32,000 square meters of unrestricted bathing pleasure in the Gastein thermal water...

Read the case study