EPFL Lausanne
Read the case study

EPFL Lausanne

Reduction of leakge: 94,1%
Location: Lausanne, Switzerland

EPFL in Lausanne is a University for engineers and architects and was founded in 1969. It includes 5 schools, 2 Colleges, 1 Transdisciplinary Entity, 28 Institutes and 354 laboratories. MEZ-AEROSEAL was used to seal 3 floors of...

Read the case study


University of Nanterre
Read the case study

University of Nanterre

Reduction of leakage: 92,2%
Location: Paris, France

During the commissioning of the installations (25 "chimneys" including 168 riser ducts made of Promat / caclium silicate), the customer measured leakages of 50% in between the fans and the outlets. After that, the customer...

Read the case study


Nursery Les Ulis
Read the case study

Nursery Les Ulis

Reduction of leakage: 92,3%
Location: Essonne, France

The air duct systems of the building were tested on tightness well after the delivery of the new construction. The test results showed that the system were considerably leaky and that tightness targets could not be met...

Read the case study


Campus Institut Mines Télécom
Read the case study

Campus Institut Mines Télécom

Reduction of leakage: 96,9%
Location: Paris, France

After several attempts to improve ductwork airtightness and after airtightness testing through a certified expert (QUALIBAT 8721), an average leakage rate of airtightness class A was determined. At the beginning...

Read the case study


WIFI St. Pölten
Read the case study

WIFI St. Pölten

Reduction of leakage: 96,6%
Location: St. Pölten, Austria

The WIFI building in St. Pölten had massive problems with odour nuisances at an existing exhaust air duct. A traditional sealing approach (manual sealing with sealant, tape, clamps, etc.) was not possible...

Read the case study


Vienna Education Campus
Read the case study

Vienna Education Campus

Reduction of leakage: 67%
Location: Vienna, Austria

We were commissioned by the company Fa. Porr with the sealing of ventilation ducts so that the tightness class „C“ is maintained. In order to be as effective as possible, special attention was paid to the...

Read the case study


Simonmetsän Daycare
Read the case study

Simonmetsän Daycare

Reduction of leakage: supply air: 84% / exhaust air: 90%
Location: Vantaa, Finnland

The HVAC system of Daycare center Simonmetsän in the Finish city of Vantaa was planned to be refurbished. In order to increase the technical and hygienical standard...

Read the case study


Technical University Vienna
Read the case study

Technical University Vienna

Reduction of leakage: 66,7%
Location: Vienna, Austria

Under the claim „Technology for People“, research, teaching and learning have been taking place at the TU Vienna for more than 200 years..

Read the case study